(Saint John M-P Rodney Weston)
(File Photo)
With the Province threatening court action against Atomic Energy Limited of Canada for cost over-runs at Point Lepreau, the MP for Saint John says a solution is on the table. Rodney Weston says in a recent meeting with Energy Minister Keir, he told him a solution can be find through proper channels.
Weston says he has been told Coleson Cove was shut down last summer so why were we buying replacement power for the refit to begin with? He adds the onus is on the Province and or NB Power to prove that AECL did not live up to it’s terms of the contract.