The interim president of the Saint John Board of Trade calls the proposed fertilizer production plant in McAllister Industrial Park exactly what Saint John needs.
Dick Daigle of the BOT tells CHSJ News the timing came as something of a surprise–albeit a pleasant one, and it is certainly in line with the True Growth 2.0 strategy the city has been looking to embrace.
Daigle says the next thing they’d like to see the city move on is shale gas. The plant is expected to cost $350 million, creating over 1,200 jobs during construction.