The Point Lepreau Nuclear Generating Station is not operating at full power.
It went off line on May 28th before getting reconnected to the electrical grid last Friday after going off line May 28th.
Testing confirmed that repairs are required on the non-nuclear side of the plant.
The station will remain at between 75 and 85 per cent power until the repairs can be done.